EQUIPMENTS
Equipment1
BUNG PROCESSOR CUM HIGH PRESSURE HIGH VACUUM STEAM STERILIZER:
A Double door processor unit with a programme Logic Controller via a microprocessor is installed through Clestra modular panel of the Sterile room.
Has a distinguished advantage of carrying out comprehensive process of – Washing, Siliconization, Sterilisation and Drying, in the same Processor with no handling required between individual stages.
VIAL WASHER, STERILISING AND DEPYROGENATING TUNNEL :
The continuos process of washing, sterilization and depyrogenation (with hot air Laminar flow sterilizing tunnel) is integrated with Compact Linear Washer in Clean Area on one hand and with Automatic two-Stroke Filling Machine in Aseptic Clean Area on other hand.
Equipment2
FILLING AND STOPPERING:
Filling and Stoppering of vials carried out under Class 100 A with a surrounding Class 100 B conditions.
VIAL SEALING:
A Separate Vial Sealing Room to prevent the generated particles contaminating the sterile powder. Sealing carried out under Class 100 A, with a surrounding Class 10,000.
ONLINE LEAK DETECTION:
Astral is first company in India to install ONLINE PRECISION LEAK DETECTION SYSTEMS from WILCO AG, Switzerland.
The Leak Detection System is designed for detection of microleaks using the vacuum decay leak testing method.
The system is designed on the concept of PAT (Process Automation Technology) and supports 100% sterility assurance.
CEO

This website and all its content is copyright property of Astral Steri Tech Pvt. Ltd. Copyright © 2012 Astral Steritech Inc. All rights reserved.